Shanxi Taiyuan electric heat tracing Huanyu Xinhe is trustworthy
Hits: 3889890
2020-03-01
Shanxi Taiyuan electric heat tracing Huanyu Xinhe is trustworthy. What determines the power consumption of the electric tracing: the power consumption of the electric tracing depends on the type and power of the selected electric tracing. For example, if the 30 watt electric tracing is selected, its power consumption per hour will be 4 kilowatts, that is, 4 kilowatts per hour, according to the length of 100 meters. The electric heating belt shall be close to the surface of machine equipment and pipeline to facilitate heat conduction. When installing, remove oil, water or other dirt from the electric heating belt. Please wipe with gasoline or other organic solvent. At regular intervals (as specified in the manufacturer's samples), the electric tropics shall be fixed radially with aluminum foil tape, and then the entire length of the electric tropics shall be covered with aluminum foil tape to ensure the safety of the electric tropics, and at the same time, the pipe surface and the electric tropics shall be tightly combined.
One is industrial electric tracing, such as constant power electric tracing, self limiting explosion-proof electric tracing, MI heating cable, anti-corrosion sampling composite pipe and skin tracing system. The second category is civil electric tracing, such as solar electric tracing, self limiting non explosion-proof electric tracing, electric floor heating, intelligent electric heating (heating cable). Three types are special electric tracing tapes, such as silicon rubber electric tracing tape, fire-fighting electric tracing tape, ceramic electric tracing tape, etc.
Key points of construction and installation 1. General Provisions (1) the following conditions shall be met before the construction of the installation project of the electric tropics: design drawings; the installation, welding, pressure test and anti-corrosion procedures of the equipment and pipelines shall be completed. Construction machines and tools and construction intensity can ensure normal construction; temporary facilities, construction materials, power and material storage sites on the construction site can meet the construction needs. (2) Before the construction of the electric tropical project, it is necessary to master the building structure and design drawings. Construction plan and other public coordination measures. The installation personnel shall understand the general performance of the electric heating belt, grasp the key points and procedures of the operation process, and prohibit blind construction.
In the winter of the northern region, when the ambient temperature reaches below zero, the fire pipe and the water supply and drainage pipe often crack and damage. Seriously affected the normal operation of the equipment, so how to effectively solve such problems? The electric heat tracing system can solve these problems effectively. At present, the domestic market of electric heat tracing products is very chaotic. The quality of products is uneven, and inferior products can be found everywhere. To ensure the quality of selected products, let's take a look at how to select electric heat tracing products together with Xiaobian
After the installation of the electric tracing band on the pipeline, it is very important to detect the whole electric tracing system. Especially, the measurement of the resistance of the electric tracing band can detect whether the electric tracing band is damaged and other problems, eliminate the potential safety hazards, so as to ensure the normal operation of the electric tracing band to provide insulation for the equipment. Then, how about the resistance of the electric tracing band About home